Search Bamber Bridge planning applications
20 applications received or decided in the last 90 days · within 1 km of the centre of Bamber Bridge · updated daily · South Ribble Borough Council
- 63 Brindle Road Bamber Bridge Preston Lancashire PR5 6YHAwaiting decisionSingle storey rear extension to existing shop, and alterations to first floor living space to create self contained flatReceived 24 Oct 202607/2026/00774/FUL
- 63 Brindle Road Bamber Bridge Preston Lancashire PR5 6YHAwaiting decisionSingle storey rear extension to existing shop, and alterations to first floor living space to create self contained flatReceived 24 Oct 202607/2026/00774/FUL
- 2 Alton Crescent Walton Le Dale Preston Lancashire PR5 4EUAwaiting decisionApplication for a certificate of lawful development certificate for a proposed rear extensionReceived 22 Oct 202607/2026/00756/CLD
- 1 Ambleside Close Walton-le-dale Preston Lancashire PR5 4RSAwaiting decisionNon material amendment to permission 07/2025/00947/HOH to install high level obscured window in side elevationReceived 19 Oct 202607/2026/00660/NMA
- 210 Chorley Road Walton-le-dale Preston Lancashire PR5 4RLAwaiting decisionProposed demolition of an existing rear extension and garage. Proposed construction of a wrap around single storey side and rear extension and front porch with pitched roofsReceived 19 Oct 202607/2026/00752/HOH
Planning in Bamber Bridge
- Approved
- 92%
- 33 of 36 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Bamber Bridge in the last 24 months, from South Ribble Borough Council's planning register.
Decided by South Ribble Borough CouncilCouncil page
Around Bamber Bridge
Postcode districts
PR5 202 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: South Ribble Borough Council
For home projects and trades
- Architects in Bamber BridgeFor planning applications, extensions and new builds.
- Building contractors in Bamber BridgeLocal builders for approved plans and permitted development.
Builders and trades: get new Bamber Bridge jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Bamber Bridge
Bamber Bridge is a sizable village located in Lancashire, England, just 3 miles southeast of Preston, within the borough of South Ribble. The name originates from Old English, meaning "tree-trunk bridge." Local residents are commonly referred to as "Briggers," making this community a unique area for those considering planning applications or developments in the region. The town has a population of approximately 12,126. It sits within the South Ribble district.
There are currently no active flood warnings for the Bamber Bridge area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Bamber Bridge a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Bamber Bridge has 5 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Bamber Bridge planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Bamber Bridge, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 56 planning applications were submitted near Bamber Bridge. Of these, 92% were approved, with an average decision time of 41 days.
The most common types were outline applications (12), full planning applications (10), discharge of conditions (4). 1 large-scale development was submitted during this period.