Ballochgoy, Argyll and Bute Planning Applications
Recent planning applications near Ballochgoy, Argyll and Bute.
Argyll and Bute · Scotland · settlement
Enter a postcode to search for planning applications near Ballochgoy.
Town Insights
Property Prices
Area Information
- Admin district: Argyll and Bute
- Parliamentary constituency: Argyll, Bute and South Lochaber
- LSOA: Rothesay Town - 07
Crime Statistics
0 crimes reported in 2026-03.
Flood Risk
No active flood warnings near Ballochgoy.
Keyword Scorecard
Planning constraint analysis based on the last 24 months of applications near Ballochgoy.
- Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
- Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
- Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
- Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
- Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
- Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
- Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
- Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)
Planning Activity Summary
Approval rates, average decision times, and application type distribution for Ballochgoy based on the last 24 months of planning data.
Nearby Applications
8 planning applications found near Ballochgoy.
- - Flat 1/1 25A Gallowgate Rothesay Isle Of Bute Argyll And Bute PA20 0HR
Change of use of existing 2 bed residential flat to short term let
Status: Undecided | Type: Full | Council: Argyll | Date: 2026-02-20
View full details - - Adjacent To The Former Gas Works Site Barone Road Rothesay Isle Of Bute Argyll And Bute
Request to discharge conditions relative to application 25/00198/PP. Specifically condition 5
Status: Undecided | Type: Conditions | Council: Argyll | Date: 2026-01-27
View full details - - Adjacent To The Former Gas Works Site Barone Road Rothesay Isle Of Bute Argyll And Bute
Request to discharge conditions relative to application 25/00198/PP. Specifically condition 6
Status: Undecided | Type: Conditions | Council: Argyll | Date: 2026-01-20
View full details - - Flat Ground/2 6 Hillhouse Road Rothesay Isle Of Bute Argyll And Bute PA20 0HY
Erection of greenhouse
Status: Permitted | Type: Full | Council: Argyll | Date: 2025-11-17
View full details - - Putting Green Esplanade Rothesay Isle Of Bute Argyll And Bute
Formation of a play park including siting of play equipment, surfacing and erection of boundary fencing and gates
Status: Undecided | Type: Full | Council: Argyll | Date: 2025-04-16
View full details - - Rothesay Primary Substation Queen Street Rothesay Isle Of Bute Argyll And Bute
Demolition of wall
Status: Permitted | Type: Heritage | Council: Argyll | Date: 2025-03-21
View full details - - 88 Montague Street Rothesay Isle Of Bute Argyll And Bute PA20 0HJ
Erection of 1 projecting sign and 1 fascia sign
Status: Permitted | Type: Advertising | Council: Argyll | Date: 2024-06-21
View full details - - 20A And 20B Argyle Street Rothesay Isle Of Bute Argyll And Bute PA20 0AU
Installation of replacement shopfronts
Status: Permitted | Type: Full | Council: Argyll | Date: 2024-03-22
View full details
Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.
A brief summary of Ballochgoy in Argyll and Bute
Ballochgoy is a settlement located in Argyll and Bute, Scotland.
There were no crimes reported in the immediate area during the most recent reporting period. This makes Ballochgoy a particularly low-crime area.
For anyone interested in property development or monitoring local planning decisions, Ballochgoy planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Planning Activity in Ballochgoy
In the last 24 months, 13 planning applications were submitted near Ballochgoy. Of these, 100% were approved, with an average decision time of 108 days.
This is notably above the national average of approximately 87%, suggesting a relatively permissive planning environment. Applicants near Ballochgoy may find that well-prepared applications have a strong chance of success.
With an average of 108 days, decisions near Ballochgoy take longer than the statutory targets. Applicants should budget for a 4-month timeline and consider pre-application discussions to avoid delays.
The most common application types near Ballochgoy were full planning applications (8), listed building and heritage (2), discharge of conditions (2). Full planning applications account for 62% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.
In terms of development scale, 2 medium-scale applications, 11 smaller schemes were submitted.
Nearby Towns
Explore planning applications in nearby areas:
- Rothesay planning applications
- Townhead planning applications
- Ardbeg planning applications
- Port Bannatyne planning applications
- Montford planning applications
- Craigmore planning applications
- Ascog planning applications
- Kerrycroy planning applications
Related Planning Guides
- What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
- What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
- How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.