Search Bakestone Moor planning applications
13 applications received or decided in the last 90 days · within 1 km of the centre of Bakestone Moor · updated daily · Bolsover District Council
- 19 Hillside Whitwell Worksop S80 4PFAwaiting decisionMinor amendment of planning application 26/00281/VAR (replace the approved brickwork supporting the garage walls with timber sleepers wrapped in damp-proof course (DPC), laid on the concrete base).Received 6 Nov 202626/00433/MINAM
- 57 Station Road Whitwell Worksop S80 4TSApprovedSingle storey extention to front, second storey extension to front over existing, double storey extension to side and single storey extension to the rear.Received 26 Oct 2026Decided 30 Jul 202626/00402/FUL
- 2 High Street Whitwell Worksop S80 4QUAwaiting decisionChange of use of ground-floor commercial unit (Class E) to 1 no. residential flat (Class C3), with associated external alterations including removal of metal fascia sign, restoration of historic timber entablature, street-facing window replacement, side door masonry infill, creation of a new outbuilding door for an enclosed bin store, and installation of a chimney-mounted kitchen extract fan.Received 13 Oct 202626/00391/FUL
- 38 High Street Whitwell Worksop S80 4RBAwaiting decisionConversion of garage, replacement of garage doors, replacement of side door and installation of side window.Received 24 Sep 202626/00345/FUL
- 108 Southfield Lane Whitwell Worksop S80 4NRApprovedErection of detached dwelling with all matters reserved (resubmission of 23/00386/OUT)Received 23 Sep 2026Decided 30 Oct 202626/00334/OUT
Planning in Bakestone Moor
- Approved
- 100%
- 20 of 20 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Bakestone Moor in the last 24 months, from Bolsover District Council's planning register.
Decided by Bolsover District CouncilCouncil page
Around Bakestone Moor
Postcode districts
S80 195 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Bolsover District Council
For home projects and trades
- Architects in Bakestone MoorFor planning applications, extensions and new builds.
- Building contractors in Bakestone MoorLocal builders for approved plans and permitted development.
Builders and trades: get new Bakestone Moor jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Bakestone Moor
Bakestone Moor is a settlement located on the western edge of Whitwell in Derbyshire, England. This area may be of interest to those researching planning applications due to its proximity to local amenities and developments.
There are currently no active flood warnings for the Bakestone Moor area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Bakestone Moor a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Bakestone Moor has 4 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Bakestone Moor planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Bakestone Moor, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 24 planning applications were submitted near Bakestone Moor. Of these, 100% were approved, with an average decision time of 39 days.
The most common types were tree works (1), other applications (1).