Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Aldringham, Suffolk Planning Applications

Recent planning applications near Aldringham, Suffolk.

Suffolk · England · settlement

View council

About Aldringham

Aldringham is a village situated in the Blything Hundred of Suffolk, England, just 1 mile south of Leiston and 3 miles northwest of Aldeburgh, near the North Sea coast. The parish encompasses the coastal village of Thorpeness and saw its population rise from an estimated 730 in 2005 to approximately 800 by mid-2022, indicating a growing community that may be relevant for local planning applications.

District: Aldringham cum Thorpe

Enter a postcode to search for planning applications near Aldringham.

Town Insights

Property Prices

Average property sale price: £298,410 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: East Suffolk
  • Parliamentary constituency: Suffolk Coastal
  • LSOA: East Suffolk 019A

Crime Statistics

7 crimes reported in 2026-03.

Crime Breakdown

  • violent-crime: 5
  • burglary: 1
  • other-theft: 1

Flood Risk

No active flood warnings near Aldringham.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Aldringham.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Aldringham based on the last 24 months of planning data.

Nearby Applications

24 planning applications found near Aldringham.

  1. DC/25/4828/CCC - East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Undecided | Type: Outline | Council: East Suffolk | Date: 2025-12-12
    View full details
  2. - East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
    Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Undecided | Type: Conditions | Council: East Suffolk | Date: 2025-12-12
    View full details
  3. - East Anglia Offshore Wind One A12 Martlesham Martlesham Suffolk
    Discharge of Requirement 14(1) (Landscape Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-12-12
    View full details
  4. DC/25/4823/CCC - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Undecided | Type: Outline | Council: East Suffolk | Date: 2025-12-12
    View full details
  5. - East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Undecided | Type: Outline | Council: East Suffolk | Date: 2025-12-12
    View full details
  6. - East Anglia One North Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
    Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-11-14
    View full details
  7. - East Anglia TWO Offshore Wind Farm Suffolk
    Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-10-22
    View full details
  8. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 22(2)(l) (Sizewell Gap Construction Method Statement) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-10-22
    View full details
  9. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-10-22
    View full details
  10. - East Anglia TWO Offshore Wind Farm Suffolk
    Discharge of Requirement 22(2)(g) (Materials Management Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-10-21
    View full details
  11. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 16(1) Access Management Plan for the Onshore Cable Duct Installation Stage, in respect of County Council Consultation - Scottish Power Renewables East Anglia ONE North Offshor
    Status: Permitted | Type: Outline | Council: East Suffolk | Date: 2025-10-17
    View full details
  12. - East Anglia ONE North Offshore Wind Farm Suffolk
    County Council Consultation - Discharge of Requirement 22(2)(a) Surface Water Drainage and Management Plan for the Onshore Cable Duct Installation Stage, in respect of Scottish Power Renewables East A
    Status: Permitted | Type: Outline | Council: East Suffolk | Date: 2025-10-17
    View full details
  13. - East Anglia TWO Offshore Wind Farm Suffolk
    County Council Consultation - Discharge of Requirement 22(2)(a) Surface Water Drainage and Management Plan for the Onshore Cable Stage, in respect of Scottish Power Renewables East Anglia TWO Offshore
    Status: Permitted | Type: Outline | Council: East Suffolk | Date: 2025-10-17
    View full details
  14. - East Anglia TWO Offshore Wind Farm Suffolk
    Discharge of Requirement 17 (Fencing and other means of enclosure) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-10-08
    View full details
  15. - East Anglia TWO Offshore Wind Farm Suffolk
    Discharge of Requirement 21 (2) (EcoMP) and Requirement 26 (1) (OPWMP) for new footpath creation works for East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Undecided | Type: Conditions | Council: East Suffolk | Date: 2025-07-10
    View full details
  16. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 21 (2) (EcoMP) and Requirement 26 (1) (OPWMP) for the SI surveys 2025 for East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-05-26
    View full details
  17. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 22 (2)(b) Flood Management Plan for Substation Haul Road Stage, in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
    Status: Permitted | Type: Outline | Council: East Suffolk | Date: 2025-03-05
    View full details
  18. - East Anglia TWO Offshore Wind Farm Suffolk
    Discharge of Requirement 18 (1) and (2) (Contaminated Land Mitigation Scheme) Substations Haul Road Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-03-05
    View full details
  19. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 18 (1) and (2) (Contaminated Land Mitigation Scheme) Substations Haul Road Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-03-05
    View full details
  20. - East Anglia ONE North Offshore Wind Farm Suffolk
    Discharge of Requirement 22 (2)(j) (Construction Artificial Light Emissions Management Plan) Substations Haul Road Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
    Status: Permitted | Type: Conditions | Council: East Suffolk | Date: 2025-03-05
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Aldringham in Suffolk

Aldringham is a village situated in the Blything Hundred of Suffolk, England, just 1 mile south of Leiston and 3 miles northwest of Aldeburgh, near the North Sea coast. The parish encompasses the coastal village of Thorpeness and saw its population rise from an estimated 730 in 2005 to approximately 800 by mid-2022, indicating a growing community that may be relevant for local planning applications. It sits within the Aldringham cum Thorpe district.

Property prices in Aldringham show an average sale price of £298,410, based on 50 recent transactions recorded by HM Land Registry.

There were 7 crimes reported in the Aldringham area during the most recent period, a moderate level that is broadly in line with similar-sized settlements.

Ecology & Nature Designations

The area around Aldringham includes 1 Sites of Special Scientific Interest (SSSI): Leiston - Aldeburgh SSSI; 1 Ancient Woodland site; 1 Areas of Outstanding Natural Beauty (AONB): Suffolk Coast & Heaths; 1 Special Protection Areas (SPA): Sandlings. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.

For anyone interested in property development or monitoring local planning decisions, Aldringham planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Aldringham

In the last 24 months, 27 planning applications were submitted near Aldringham. Of these, 100% were approved, with an average decision time of 47 days.

This is notably above the national average of approximately 87%, suggesting a relatively permissive planning environment. Applicants near Aldringham may find that well-prepared applications have a strong chance of success.

The average decision time of 47 days is within the government's 8-week statutory target for minor applications, indicating an efficient planning department.

The most common application types near Aldringham were discharge of conditions (16), outline applications (9), full planning applications (2).

Nearby Towns

Explore planning applications in nearby areas:

  • Coldfair Green planning applications
  • Leiston planning applications
  • Knodishall planning applications
  • Friston planning applications
  • Thorpeness planning applications
  • Sizewell planning applications
  • Aldeburgh planning applications
  • Theberton planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account