Search Aldridge planning applications
11 applications received or decided in the last 90 days · within 1 km of the centre of Aldridge · updated daily · Walsall Metropolitan Borough Council
- Land at Middlemore Lane Filling Station, Aldridge, Walsall, WS9 8DLAwaiting decisionAdvertisement consent for one internally illuminated double-sided LED advertisement display measuring 2.40 metres (h) x 1.23 metres (w) x 0.34 metres (d).Advertisement ConsentReceived 5 Nov 202626/1267
- 3, Noddy Park Road, Aldridge, Walsall, WS9 8NQAwaiting decisionT1 - Yew tree - fellTree Application: Works to Protected Trees in a Conservation AreaReceived 26 Oct 202626/1236
- 146, Erdington Road, Aldridge, Walsall, WS9 0RTApprovedFull planning application for a single storey rear extension and a two storey side extension.Full Application: HouseholderReceived 15 Oct 2026Decided 18 Jun 202626/1052
- 48, Tynings Lane, Aldridge, Walsall, WS9 0ASAwaiting decisionFull planning application for a single-storey side extension, including garage conversion.Full Application: HouseholderReceived 2 Oct 202626/1060
- Land to west of no. 27, Anchor Parade, Aldridge, Walsall, WS9 8QPAwaiting decisionAdvertisement consent for installation of 1 x two-sided D6 outdoor digital display unit (H) 2.7m x (W) 1.3m x (D) 0.34mAdvertisement ConsentReceived 23 Sep 202626/1067
Planning in Aldridge
- Approved
- 74%
- 26 of 34 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Aldridge in the last 24 months, from Walsall Metropolitan Borough Council's planning register.
Decided by Walsall Metropolitan Borough CouncilCouncil page
Around Aldridge
Postcode districts
WS9 89 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Walsall Metropolitan Borough Council
For home projects and trades
- Architects in AldridgeFor planning applications, extensions and new builds.
- Building contractors in AldridgeLocal builders for approved plans and permitted development.
Builders and trades: get new Aldridge jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Aldridge
Aldridge is a prominent town located within the Metropolitan Borough of Walsall in the West Midlands, England. Once a village in Staffordshire, it became part of Walsall in 1974 and is now the second-largest town in the borough. Situated three miles from Brownhills, five miles from Walsall, six miles from Sutton Coldfield, and seven miles from Lichfield, Aldridge presents a mix of residential and commercial opportunities for planning applications.
There are currently no active flood warnings for the Aldridge area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Aldridge a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Aldridge has 6 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Aldridge planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Aldridge, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 51 planning applications were submitted near Aldridge. Of these, 74% were approved, with an average decision time of 54 days.
The most common types were full planning applications (18), tree works (7), outline applications (6). 1 large-scale development was submitted during this period.
3 planning appeals were lodged, of which 0 were allowed and 3 were dismissed (0% success rate).