Land North of 77 Marsh Wall, London, E14
Approved on 27 August 2024
Proposal
Use of vacant car park/hard standing and the construction of prefabricated structures for use as ...
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
- Submitted
- 21 February 2024
- ReceivedSubmitted21 Feb
- ValidatedValidated
- Consult.Consultation
- TargetTarget Date
- DecidedDecided27 Aug
Decided in 188 days
About this application
This is a planning application at Land North of 77 Marsh Wall, London, E14. Tower Hamlets has handled 11,273 applications of this type. This one was decided in 188 days, 19 weeks longer than Tower Hamlets's typical decision time. There are no previous applications recorded at this address.
Application details
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
- Article 4 direction: Canary Wharf
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
3 other applications at this property, newest first.
- 202521 Oct
A phased development comprising demolition of the existing office building (Use Class E) and the construction…
ClosedAll OtherDC/25/141885 - 20258 Oct
A phased development comprising demolition of the existing office building (Use Class E) and the construction…
PendingFull Planning PermissionPA/25/01729 - 202513 Mar
Request for an Environmental Impact Assessment (EIA) Scoping opinion under Regulation 15 of the Town and…
ApprovedScoping Opinion (EIA Regs)PA/25/00482/NC
Source: Tower Hamlets
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
For applicants and trades
Contractors near this project
- Building Services LondonVerifiedLondonExtensionsLoft Conversions2.0 mi
- S & M Solutions LtdVerifiedLondonExtensionsLoft Conversions2.4 mi
- Inspire Spray CoatVerifiedLondonuPVC Window and Door SprayingGarage Door Spraying3.6 mi
- Orient Construction Consultancy LimitedVerifiedLondon4.0 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.