Communication Station Vodafone 36389A Nuffield Road Cowpen Lane Industrial Estate Billingham TS23 4DA
Approved on 16 January 2026
Council decision: Approved with ConditionsDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Notice under regulation 5 of electronic communications code regulations for the removal of existing 6no antennas and replace with proposed 9no antennas, the addition of proposed 1no dish and any other associated ancillary works thereto.
- Received
- 16 December 2025
- Decision level
- Delegated (officer decision)
- Public comments
- 2
- Ward
- Billingham South
- ReceivedReceived16 Dec
- ValidatedValidated16 Dec
- Consult.Consultation7 Jan
- TargetTarget Date6 Jan
- DecidedDecided16 Jan
Decided in 31 days (council typically 49)
About this application
This is a telecoms application at Communication Station Vodafone 36389A Nuffield Road Cowpen Lane Industrial Estate Billingham TS23 4DA. Stockton-on-Tees has handled 193 applications of this type. This one was decided in 31 days, 3 weeks quicker than Stockton-on-Tees's typical decision time. There has been 1 other application at this address. In the past year there have been 49 applications across Billingham South. We hold 874 applications in total for the TS23 postcode area.
100% of telecoms applications at Stockton-on-Tees Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- TS23 4DA
- Application type
- Telecommunication Notification
- Scale / size
- Small
- Parish
- Billingham Town Council
Planning application dates
- Date validated
- 16 December 2025
- Consultation expiry
- 7 January 2026
- Consultation start
- 17 December 2025
- Consultation end
- 7 January 2026
- Last date for comments
- 7 January 2026
- Target decision date
- 6 January 2026
- Permission expires
- 16 January 2031
Planning decision
- Statutory period
- 21 days
Additional information
- Documents
- 8
- Constraints
- 1
Site constraints
Designations that overlap or adjoin the site outline.
- Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/RamsarApplies to new homes and overnight accommodation
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
1 other application at this property, newest first.
Source: Stockton-on-Tees
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near TS23
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Communication Station Vodafone 36389A Nuffield Road Cowpen Lane Industrial Estate Billingham TS23 4DA23/2206/TNOT · TelecomsAwaiting decision0.0 mi
- Elliott Loo Hire Nuffield Road Cowpen Lane Industrial Estate Billingham TS23 4DA19/0832/VARY · ConditionsApproved0.0 mi
- Land Adjacent To Thomas Plant Hire Nuffield Road Cowpen Lane Industrial Estate Billingham26/1103/TNOT · TelecomsAwaiting decision0.1 mi
- P D Portcentric Logistics Cowpen Lane Billingham Stockton-On-Tees TS23 4DB15/0443/CPL · OutlineApproved0.1 mi
- Paralloy House Nuffield Road Cowpen Lane Industrial Estate Billingham TS23 4DA07/3489/FUL · FullApproved0.1 mi
For applicants and trades
Contractors near this project
Find contractors for demolition near this site- I & J DevelopmentsWindow & Door Installer0.2 mi
- Service StocktonElectrician0.3 mi
- I C S Integrated Cable Services LtdBuilding controlsCommercial & industrial electrical installations0.4 mi
- Billingham Windows and Conservatories LtdWindow & Door Installer0.4 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.