EN010154

Planning application at The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln, NSIP England. View planning documents, track the decision and get email alerts on updates.

Enriching application data
2/3
Council recordsAppealsFlood risk
Pending Decision
Loading…

Fosse Green Energy. Generating station with an anticipated capacity in excess of 50MW comprising the installation of solar photovoltaic panels, associated electrical equipment, cabling and on-site energy storage facilities together with grid connection infrastructure for the construction, operation, maintenance and decommissioning of the Fosse Green Energy scheme. Anticipated submission period 18 July 2025

EN010154

Large

The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln

Submitted18 Jul
Validated
Consultation
Target
Decided

This is a planning application for a solar installation at The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln. NSIP England has handled 20 applications of this type and approves nearly all of them, typically deciding them in 478 days. It was submitted on 18 July 2025 and is still awaiting a decision. There are no previous applications recorded at this address.

Track this application

Get email alerts when there is a planning decision or status change.

Application Details

Reference
EN010154
Address
The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln
Local Authority
NSIP England
Scale / Size
Large
Decision Status
Undecided

Applicant & Agent

Planning Application Dates

Date Submitted
18 July 2025

Planning Decision

Publicity

Appeal

Additional Information

Coordinates
53.151714, -0.648007

Source: NSIP England