The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln

EN010154Generating StationsAwaiting decision

Proposal

Fosse Green Energy. Generating station with an anticipated capacity in excess of 50MW comprising the installation of solar photovoltaic panels, associated electrical equipment, cabling and on-site energy storage facilities together with grid connection infrastructure for the construction, operation, maintenance and decommissioning of the Fosse Green Energy scheme. Anticipated submission period 18 July 2025

Received
18 July 2025
Council
NSIP England
  1. Received18 Jul
  2. Validated15 Aug
  3. Consult.
  4. Target
  5. Decided

About this application

This is a planning application for a solar installation at The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln. NSIP England has handled 21 applications of this type. It has been with the council since 18 July 2025 and is still awaiting a decision. There are no previous applications recorded at this address.

Application details

Application type
Generating Stations
Scale / size
Large

Planning application dates

Date validated
15 August 2025
Consultation start
6 January 2026

Applicant and agent

Applicant
Fosse Green Energy Limited

Additional information

Documents
627

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Source: NSIP England

Track this application

Get email alerts when there is a planning decision or status change.