Skip to content
Decision dueSolar farm· EN010154

Fosse Green Energy

A nationally significant infrastructure project in North Kesteven, Lincolnshire. The Secretary of State is deciding.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,368 hectares inside the published boundary.

What is proposed

Generating station with an anticipated capacity in excess of 50MW comprising the installation of solar photovoltaic panels, associated electrical equipment, cabling and on-site energy storage facilities together with grid connection infrastructure for the construction, operation, maintenance and decommissioning of the Fosse Green Energy scheme.

Linked planning applications

Council consultations, related applications and requirement sign-offs that quote this project.

  • EN010154 · NSIP England · 18 July 2025

    Fosse Green Energy. Generating station with an anticipated capacity in excess of 50MW comprising the installation of solar photovoltaic panels, associated electrical equipment, cabling and on-site energy storage facilities together with grid connection infrastructure for the construction, operation,

  • 146954 · West Lindsey · 20 June 2023

    PINS consultation on behalf of the Secretary of State for its opinion (a scoping Opinion) as to the information to be provided in an Environmental Statement - EN010154

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.