Skip to content

Eastern Way Quarries, Land to the North and South of Eastern Way, Heath and Reach

PLN/2026/1622Adjoining Authority ConsultationApproved
Outline / PiP

Approved

Council decision: No ObjectionDelegated (officer decision)

The council did not publish a location for this application.

Proposal

Consultation from Central Bedfordshire Council on application ref. CB/26/02378/DB seeking permission for Development Brief relating to Hybrid Planning Application (Environmental Impact Assessment application) comprising: Part A – Full planning permission for 2 wind turbines with associated accesses, repowering through the life extension of the existing 'Double Arches' and 'Checkley Wood' wind turbines, solar arrays; and associated infrastructure; provision of a roundabout and junction amendments between the A5 (Watling Street) and Eastern Way; new access and road from Shenley Hill Road; new roundabout, revised junctions, accesses and improvements along Mile Tree Road; new roundabout and access to the north of Eastern Way. Part B - Outline planning permission for a mixed-use scheme including up to 3,600 residential units (including affordable housing and specialist accommodation for older people); new employment and industrial floorspace and ancillary facilities; community infrastructure (including Narrow Gauge Railway terminus and museum); education facilities (including a secondary school and primary schools); healthcare provision; local centre uses (to include retail, community and employment uses); sports hubs (including sports provision); green infrastructure and landscaping works (to include a country park, formal and informal open space, amenity space, woodland and ecological areas); electrical vehicle charging facilities; transport mobility hubs; drainage works (including foul and surface water drainage infrastructure); vehicular and active travel infrastructure; ground remodelling, engineering and demolition works. All matters reserved save for principal points of access. The development is submitted as a phased and severable scheme, and each component of the development is capable of being delivered independently

Received
31 July 2026
Decision level
Delegated (officer decision)
  1. Received31 Jul
  2. Validated31 Jul
  3. Consult.
  4. Target
  5. Decided

About this application

This is an outline application for demolition at Eastern Way Quarries, Land to the North and South of Eastern Way, Heath and Reach. Milton Keynes has handled 523 applications of this type. It has been with the council since 31 July 2026 and is still awaiting a decision. The site is in a conservation area. There have been 2 other applications at this address.

80% of outline applications at Milton Keynes City Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Flood & Drainage

Application details

Application type
Adjoining Authority Consultation
Scale / size
Large
Number of dwellings
3600

Planning application dates

Date validated
31 July 2026
Application expires
20 August 2026

Planning decision

Decision
No Objection
Statutory period
20 days

Additional information

Documents
3

Site constraints

Designations that overlap or adjoin the site outline.

  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (24)

flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Milton Keynes

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.