Skip to content

Site of Former Nurseries Stow Road Wisbech Cambridgeshire

22/01324/CONConsultation by Adjoining AuthorityDecided
Outline / PiP

Decided on 22 August 2022

Council decision: Consultation by Adj AuthorityConsultation by Adj Authority

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Residential development of up to 9 x dwellings involving the demolition of existing dwelling (61 Stow Road) and buildings (application for Permission in Principle)

Received
27 July 2022
Decision level
Consultation by Adj Authority
  1. Received27 Jul
  2. Validated27 Jul
  3. Consult.
  4. Target24 Aug
  5. Decided22 Aug

Decided in 26 days (council typically 49)

About this application

This is an outline application for demolition at Site of Former Nurseries Stow Road Wisbech Cambridgeshire. Kings Lynn has handled 937 applications of this type. There are no previous applications recorded at this address.

73% of outline applications at King's Lynn and West Norfolk Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Consultation by Adjoining Authority
Scale / size
Small

Planning application dates

Date validated
27 July 2022
Target decision date
24 August 2022
Permission expires
22 August 2027

Planning decision

Statutory period
28 days

Additional information

Comments
0
Documents
4

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Article 4 direction: Small Houses in Multiple Occupation (HMOs) in Wisbech
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Kings Lynn

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.