Skip to content
Decision madeEnergy from waste· EN010110

Medworth Energy from Waste Combined Heat and Power Facility

A nationally significant infrastructure project in Cambridgeshire, Fenland, Kings Lynn, King's Lynn and West Norfolk, Norfolk. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 17 hectares inside the published boundary.

What is proposed

An Energy from Waste combined heat and power facility with a maximum gross capacity of 58MW

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.