Skip to content

East Anglia ONE North Offshore Wind Farm Suffolk

DC/25/4097/DRRDischarge of Requirements (56 days)Approved
Discharge / amendments

Approved on 11 December 2025

Council decision: Application PermittedDelegated (officer decision)

Approximate location: the centre of the postcode, not the exact property.

Proposal

Discharge of Requirement 22(2)(l) (Sizewell Gap Construction Method Statement) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

Received
22 October 2025
Decision level
Delegated (officer decision)
Public comments
5
Ward
Woodbridge
  1. Received22 Oct
  2. Validated22 Oct
  3. Consult.13 Nov
  4. Target17 Dec
  5. Decided11 Dec

Decided in 50 days (council typically 56)

About this application

This is an application to discharge conditions at East Anglia ONE North Offshore Wind Farm Suffolk. East Suffolk has handled 1,341 applications of this type. This one was decided in 50 days, 6 days quicker than East Suffolk's typical decision time. The site is in 1 listed building nearby. There have been 12 other applications at this address. In the past year there have been 71 applications across Woodbridge.

99% of conditions applications at East Suffolk Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Discharge of Requirements (56 days)
Scale / size
Small
Parish
Woodbridge

Planning application dates

Date validated
22 October 2025
Last date for comments
13 November 2025
Target decision date
17 December 2025

Planning decision

Statutory period
56 days

Additional information

Documents
11

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Planning history at this site

9 other applications at this property, newest first.

  1. 2026
    24 Aug

    Discharge of Requirement 40 (Amendments to approved details - Amendment to Approved Landscape Masterplan)…

    ApprovedDischarge of conditionsDC/26/2999/DRR
  2. 2026
    24 Jun

    Consultation - Pre-construction Monitoring Plan for East Anglia One North

    PendingDischarge of conditionsDC/26/2306/CON
  3. 2026
    27 May

    Discharge of Requirement 40 (Amendments to approved details - Use of Tower Cranes during the Construction of…

    PendingDischarge of conditionsDC/26/1958/DRR
  4. 2026
    26 Mar

    Consultation - East Anglia TWO Limited (EATL) and East Anglia ONE North Limited (EAONL) are writing to the…

    ApprovedDischarge of conditionsDC/26/1172/CON
  5. 2025
    12 Dec

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East…

    PendingDischarge of conditionsDC/25/4823/CCC
  6. 2025
    26 May

    Discharge of Requirement 21 (2) (EcoMP) and Requirement 26 (1) (OPWMP) for the SI surveys 2025 for East…

    ApprovedDischarge of conditionsDC/25/2154/DRR

Source: East Suffolk

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.