Rockbeare Hill Quarry Rockbeare Exeter EX5 2HB
Approved on 8 August 2016
Council decision: DCC Application - No objectionsDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Retention of existing asphalt plant, aggregate store and ancillary stockyard/storage bays with importation and storage of recycled asphalt planings (RAP) for use in the asphalt plant (DCC application)
- Received
- 13 June 2016
- Decision level
- Delegated (officer decision)
- Council
- East Devon District Council
- Ward
- Broadclyst (pre 02/05/19)
- ReceivedReceived13 Jun
- ValidatedValidated13 Jun
- Consult.Consultation7 Jul
- TargetTarget Date
- DecidedDecided8 Aug
Decided in 56 days (council typically 49)
About this application
This is a planning application at Rockbeare Hill Quarry Rockbeare Exeter EX5 2HB. East Devon has handled 185 applications of this type. This one was decided in 56 days, 7 days longer than East Devon's typical decision time. There have been 8 other applications at this address. We hold 1,242 applications in total for the EX5 postcode area.
90% of all applications at East Devon District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Postcode
- EX5 2HB
- Application type
- County Matter
- Scale / size
- Small
- Parish
- Rockbeare
Planning application dates
- Date validated
- 13 June 2016
- Consultation start
- 15 June 2016
- Last date for comments
- 7 July 2016
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
8 other applications at this property, newest first.
- 202517 Apr
Minor Amendment for 16/1464/MFUL
WithdrawnNon-material amendment25/0905/NMA - 20245 Mar
Variation of additional condition added (by NMA dated 8 May 2025) to planning permission 16/1464/MFUL
Approval with conditionsVariation of conditions (s73)24/0366/VAR - 201910 Jul
County matter application for the importation of inert soils and subsoil to allow for revised restoration…
ApprovedCounty Matter19/1549/CM - 20164 Jul
Replacement of existing manufacturing building with new factory building for precast concrete manufacturing…
Approval with conditionsMajor - Full application16/1464/MFUL - 201518 Sep
Certificate of Lawfulness for continued use of building and associated land for training purposes and car…
PendingCertificate Existing Lawful Use/Dev15/2246/CPE - 201519 Jan
Certificate of lawfulness for use of the Land as a depot for a highway and civil engineering maintenance and…
ApprovedCertificate Existing Lawful Use/Dev15/0154/CPE - 201411 Nov
Proposed offices and stockbays and relocation of existing weighbridge at Rockbeare Quarry, Rockbeare
ApprovedCounty Matter14/2719/CM - 201128 Apr
Retention of temporary office accommodation
Approval with conditionsChange of Use11/0855/COU
Source: East Devon
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near EX5
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Rockbeare Quarry, RockbeareDCC/3867/2016 · FullApproved0.0 mi
- Rockbeare Hill Quarry Rockbeare Exeter EX5 2HB14/2719/CM · OtherApproved0.1 mi
- Rockbeare Quarry, RockbeareDCC/3710/2014 · FullApproved0.1 mi
- Rockbeare Hill Quarry Rockbeare Exeter EX5 2HB15/2246/CPE · AmendmentAwaiting decision0.1 mi
- Rockbeare Hill Quarry Rockbeare Exeter EX5 2HB15/0154/CPE · AmendmentApproved0.1 mi
For applicants and trades
Contractors near this project
- Hartwood Timberworks Ltd t/a Hartwood TreeworksTree Surgeons0.7 mi
- L V Electrical ServicesElectrician0.9 mi
- Minerva Roofing LtdRooferVelux Window Installer1.1 mi
- LNE Electrical ServicesElectrician1.2 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report