Land East Of 34 Quarry Lane Swaffham Bulbeck Cambridgeshire CB25 0LU
Refused on 21 March 2025
Council decision: RefuseDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Reserved matters for Appearance and Landscaping of previously approved application 22/00636/OUT for Outline with matters of access, layout and scale committed for 2no. two-storey detached residential dwellings with detached double garage
- Received
- 11 July 2024
- Decision level
- Delegated (officer decision)
- Public comments
- 6
- Ward
- Bottisham
- ReceivedReceived11 Jul
- ValidatedValidated2 Aug
- Consult.Consultation30 Aug
- TargetTarget Date27 Sep
- DecidedDecided21 Mar
Decided in 231 days (council typically 42)
About this application
This is an outline application for a garage at Land East Of 34 Quarry Lane Swaffham Bulbeck Cambridgeshire CB25 0LU. East Cambridgeshire has handled 313 applications of this type. This one was decided in 253 days, 30 weeks longer than East Cambridgeshire's typical decision time. There has been 1 other application at this address. In the past year there have been 47 applications across Bottisham. We hold 1,521 applications in total for the CB25 postcode area.
80% of outline applications at East Cambridgeshire District Council were approved. Across all application types, the council typically decides in about 6 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- CB25 0LU
- Application type
- Reserved Matters consent
- Scale / size
- Small
- Parish
- Swaffham Bulbeck
Planning application dates
- Date validated
- 2 August 2024
- Consultation expiry
- 16 September 2024
- Consultation start
- 21 March 2025
- Consultation end
- 30 August 2024
- Neighbour consultation start
- 21 March 2025
- Neighbour consultation end
- 30 August 2024
- Target decision date
- 27 September 2024
Applicant and agent
- Agent address
- FAO Mr Malcolm Daines-Smith North Barn Church Lane Freckenham Bury St Edmunds Suffolk IP28 8JF
Planning decision
- Statutory period
- 56 days
Publicity
- Last advertised
- 15 August 2024
- Advertisement expiry
- 30 August 2024
- Site notice start
- 23 August 2024
- Site notice end
- 16 September 2024
Additional information
- Planning Portal ID
- PP-13232913
- Documents
- 29
- Constraints
- 20
Site constraints
Designations that overlap or adjoin the site outline.
- Green belt: East CambridgeshirePart of the site
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
2 other applications at this property, newest first.
- 202624 Mar
Construction of 2 new houses with double detached garages plus ancillary works and new vehicular access
WithdrawnFull Application26/00335/FUL - 20189 Oct
To discharge conditions 3 (external materials), 5 (foul & surface water drainage), 7 (biodiversity), 8 (land…
PendingDischarge of conditions18/00821/DISA
Source: East Cambridgeshire
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near CB25
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Land East Of 34 Quarry Lane Swaffham Bulbeck Cambridgeshire CB25 0LU26/00335/FUL · FullWithdrawn0.0 mi
- Land East Of 34 Quarry Lane Swaffham Bulbeck18/00821/DISA · ConditionsAwaiting decision0.0 mi
- 26 Vicarage Close Swaffham Bulbeck Cambridge CB25 0LY25/00281/CLP · OutlineApproved0.2 mi
- Martin House 1 Station Road Swaffham Bulbeck Cambridge CB25 0NB25/01145/TRE · TreesApproved0.2 mi
- 26 Vicarage Close Swaffham Bulbeck Cambridge CB25 0LY19/01408/FUL · FullApproved0.2 mi
For applicants and trades
Contractors near this project
Find contractors for landscaping & driveways near this site- J A Martin Stove InstallationsSolid Fuel Heating0.2 mi
- Huttie Building Services LtdElectricianSolar Panel Installer0.3 mi
- Alliance Asbestos Services Ltd0.4 mi
- Maple Facility Services LtdElectrician0.4 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.