Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton Cambridgeshire
Approved on 5 June 2025
Council decision: ApproveDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Application to Discharge Requirement 09(2)(a)(xii) of the Cambridge Waste Water Treatment Plant Relocation DCO: Materials Management Plan
- Received
- 26 April 2025
- Decision level
- Delegated (officer decision)
- Ward
- Waterbeach
- ReceivedReceived26 Apr
- ValidatedValidated28 Apr
- Consult.Consultation
- TargetTarget Date21 Jul
- DecidedDecided5 Jun
Decided in 38 days (council typically 49)
About this application
This is an application to discharge conditions at Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton Cambridgeshire. Cambridgeshire has handled 152 applications of this type. This one was decided in 40 days, 9 days quicker than Cambridgeshire's typical decision time. The site is in the Fen Ditton conservation area, with 4 listed buildings nearby. There have been 7 other applications at this address. In the past year there have been 6 applications across Waterbeach.
100% of conditions applications at Cambridgeshire County Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Discharge of Requirements
- Scale / size
- Medium
- Parish
- Horningsea
Planning application dates
- Date validated
- 28 April 2025
- Target decision date
- 21 July 2025
Applicant and agent
- Agent
- Anglian Water
- Agent address
- Worldwide House Thorpe Wood Peterborough PE3 6SB United Kingdom
Planning decision
- Statutory period
- 84 days
Site constraints
Designations that overlap or adjoin the site outline.
- Conservation area: Fen Ditton
- Green belt: South CambridgeshireNext to the site
- Flood zone 1: Low probability (rivers and sea)
Possibly incomplete for this council: Article 4 directions, tree preservation orders and brownfield registers.
Also checked, none recorded (18)
flood storage areas, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202527 Apr
Application to Discharge Requirement 09(2)(a)(v) of the Cambridge Waste Water Treatment Plant Relocation DCO…
ApprovedDischarge of conditionsFiled alongsideCCC/25/061/DOR - 202527 Apr
Application to Discharge Requirement 09(2)(a)(vi) of the Cambridge Waste Water Treatment Plant Relocation…
ApprovedDischarge of conditionsFiled alongsideCCC/25/062/DOR - 202526 Apr
Application to Discharge Requirement 09(2)(a)(iii) of the Cambridge Waste Water Treatment Plant Relocation…
ApprovedDischarge of conditionsFiled alongsideCCC/25/056/DOR - 202526 Apr
Application to Discharge Requirement 09(2)(a)(ii) of the Cambridge Waste Water Treatment Plant Relocation…
ApprovedDischarge of conditionsFiled alongsideCCC/25/057/DOR - 202526 Apr
Application to Discharge Requirement 09(2)(a)(ix) of the Cambridge Waste Water Treatment Plant Relocation…
ApprovedDischarge of conditionsFiled alongsideCCC/25/058/DOR - 202526 Apr
Application to Discharge Requirement 09(2)(a)(xii) of the Cambridge Waste Water Treatment Plant Relocation…
This applicationApprovedDischarge of conditionsCCC/25/059/DOR - 202526 Apr
Application to Discharge Requirement 13(1)(a)(b) of the Cambridge Waste Water Treatment Plant Relocation DCO…
ApprovedDischarge of conditionsFiled alongsideCCC/25/060/DOR
Planning history at this site
1 other application at this property, newest first.
Source: Cambridgeshire
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton CambridgeshireCCC/25/058/DOR · ConditionsApproved0.0 mi
- Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton CambridgeshireCCC/25/061/DOR · ConditionsApproved0.0 mi
- Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton CambridgeshireCCC/25/056/DOR · ConditionsApproved0.0 mi
- Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton CambridgeshireCCC/25/067/DOR · ConditionsApproved0.0 mi
- Cambridge Waste Water Treatment Plant Relocation Horningsea Road Fen Ditton CambridgeshireCCC/25/060/DOR · ConditionsApproved0.0 mi
For applicants and trades
Contractors near this project
- Resolve Roofing Ltd0.5 mi
- Barnwell Electrical Co LtdElectrician0.6 mi
- Titan Electrical LtdElectrician0.7 mi
- Marshall Land Systems LtdCommercial & industrial electrical installationsFire Detection and Alarm Systems0.7 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.