Skip to content

70 Cairns Road Bristol BS6 7TH

26/12920/BNGAwaiting decision
Discharge / amendments
Approximate location: the centre of the postcode, not the exact property.

Proposal

Application for approval of details reserved by condition nos. 5 (BNG) of permission 26/11917/X - Application for Removal or Variation of Condition No. 13(List of Approved plans and drawings) following a Grant of Planning permission (25/10284/F Demolition of existing non-residential single storey building (Use class E(d)) to create two semi-detached three-bedroom dwellings.)

Received
3 July 2026
Decision due
28 August 2026
Public comments
0 · last counted 10 October 2026
  1. Received3 Jul
  2. Validated3 Jul
  3. Consult.
  4. Target28 Aug
  5. Decided

About this application

This is a planning application for demolition at 70 Cairns Road Bristol BS6 7TH. Bristol has handled 13,539 applications of this type. It has been with the council since 3 July 2026 and is still awaiting a decision. There have been 2 other applications at this address. We hold 585 applications in total for the BS6 postcode area.

Application details

Postcode
BS6 7TH

Planning application dates

Date validated
3 July 2026
Decision issued
4 September 2026

Planning decision

Decision
Condition application decided

Additional information

Documents
6

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Article 4 direction: Redland Ward (1999 ward boundary)
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2026
    3 Jul

    Application for approval of details reserved by condition nos. 6 (Soft Landscape) and 7 (SuDs) of permission…

    Condition application decidedDischarge of conditionsFiled alongside26/12805/COND
  2. 2026
    3 Jul

    Application for approval of details reserved by condition nos. 5 (BNG) of permission 26/11917/X

    This applicationCondition application decidedDischarge of conditions26/12920/BNG

Source: Bristol

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near BS6

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.