The Peel Centre Skimped Hill Lane Bracknell Berkshire
Approved on 26 August 2010
Council decision: Approved & Legal Agreement SignedPlanning committee
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Section 73 application to allow an amendment to scheme for partial refurbishment, demolition and redevelopment of shopping park, along with insertion of mezzanine floors, provision of new site access and reorganisation of parking routes through the site and provision of landscaping- comprising omission of Unit 2A, reconfiguration of Units 2B and 2C, increase in the size of Unit 3A at ground floor and mezzanine floor level, increase in the floorspace of Unit 3B, reduction in number of car parking spaces by 14 spaces including a reduction in the size of the staff parking area within the service area, alterations to the service yard and modifications to the pedestrian access and cycle spaces without compliance with conditions 02 and 21 of planning permission 09/00739/FUL. (The purpose of this application is to allow Unit 2B/2C to be occupied as a single unit with the ability to sub-divide it in the future).
- Received
- 31 March 2010
- Decision level
- Planning committee
- Public comments
- 5
- Council
- Bracknell Forest Council
- Ward
- Wildridings And Central
- ReceivedReceived31 Mar
- ValidatedValidated31 Mar
- Consult.Consultation27 Apr
- TargetTarget Date26 May
- DecidedDecided26 Aug
Decided in 148 days (council typically 56)
About this application
This is a full planning application for demolition at The Peel Centre Skimped Hill Lane Bracknell Berkshire. Bracknell has handled 504 applications of this type. This one was decided in 148 days, 13 weeks longer than Bracknell's typical decision time. There have been 3 other applications at this address.
91% of full applications at Bracknell Forest Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Application type
- Full
- Scale / size
- Small
- Parish
- Bracknell Town Council
Planning application dates
- Date validated
- 31 March 2010
- Consultation expiry
- 27 April 2010
- Consultation end
- 27 April 2010
- Neighbour consultation start
- 6 April 2010
- Neighbour consultation end
- 27 April 2010
- Last date for comments
- 6 May 2010
- Target decision date
- 26 May 2010
- Committee meeting
- 26 August 2010
- Decision issued
- 27 August 2010
- Permission expires
- 27 August 2015
Applicant and agent
- Agent address
- Blue Sky Planning Bourne House 475 Godstone Road Laterham Surrey LA3 0BL
Planning decision
- Statutory period
- 56 days
Additional information
- Documents
- 49
Site constraints
Designations that overlap or adjoin the site outline.
- Brownfield land register: The Peel Centre and The Point, Skimped Hill Lane, BracknellRegister site at or near this address · +4 more
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
3 other applications at this property, newest first.
- 202328 Apr
Section 73 application to vary Condition 02 (Food sales floor area) for Planning Permission 21/00139/FUL
WithdrawnVariation of conditions (s73)23/00290/FUL - 201013 Dec
Section 73 application to allow an amendment to scheme for partial refurbishment, demolition and…
ApprovedVariation of conditions (s73)10/00826/FUL - 200930 Apr
Installation of 5 no. internally illuminated signs and 2 no. non illuminated signs.(Affects Morrisons…
ApprovedAdvertisement consent09/00235/A
Source: Bracknell
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- The Peel Centre Skimped Hill Lane Bracknell Berkshire09/00235/A · AdvertisingApproved0.0 mi
- 4 The Peel Centre Skimped Hill Lane Bracknell Berkshire RG12 1EJ08/00956/A · AdvertisingApproved0.0 mi
- 4 And 4AThe Peel Centre Skimped Hill Lane Bracknell Berkshire RG12 1EJ10/00734/A · AdvertisingApproved0.0 mi
- Units 4B and 5C The Peel Centre Skimped Hill Lane Bracknell Berkshire RG12 1EN23/00197/CLPUD · OutlineApproved0.0 mi
- 4B The Peel Centre Skimped Hill Lane Bracknell Berkshire RG12 1EN11/00466/A · AdvertisingApproved0.0 mi
For applicants and trades
Contractors near this project
- Evolution Electrical Services LimitedElectrician0.1 mi
- Smart Ft LtdBuilding controlsCommercial & industrial electrical installations0.1 mi
- Boswell Electrical Works LtdElectrician0.1 mi
- Pilon LtdBuilderBuilders0.2 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report