Decision madeGas power station· EN010055
Wrexham Energy Centre
A nationally significant infrastructure project in Wrexham. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 977 hectares inside the published boundary.
What is proposed
A combined cycle gas turbine (CCGT) power station with a generating capacity of up to 299 MWe. The project will include an integral gas connection.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.