Triton Knoll Offshore Wind Farm
A nationally significant infrastructure project offshore. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 14,653 hectares inside the published boundary.
What is proposed
The development proposal comprises the construction and operation of up to 288 wind turbine generators with a maximum tip height of up to 220 metres, offshore substations, meteorological stations and underwater cabling to connect the turbines and substations. A full description of the works can be found in Volume 1, Chapter 6 of the Environmental Statement.