Triton Knoll Electrical System
A nationally significant infrastructure project in Boston, East Lindsey, Lincolnshire. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 29,765 hectares inside the published boundary.
What is proposed
Triton Knoll Electrical System works are needed to transmit the electricity generated by the consented Triton Knoll Offshore Wind Farm to the National Grid. The Secretary of State for Energy and Climate Change directed on 14 November 2013 (in accordance with section 35) that these works require development consent under the Planning Act 2008. The electrical system will include: onshore and offshore buried export cables and associated works; an intermediate electrical compound to provide voltage stability and compensate for electrical losses; and a substation located in the vicinity of the grid connection point.