Decision madeGas power station· EN010082
Tees CCPP
A nationally significant infrastructure project in Redcar and Cleveland. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 15 hectares inside the published boundary.
What is proposed
A gas fired combined cycle gas turbine (CCGT) power station with a maximum generating capacity of up to 1,700 MWe (Tbc). The project will utilise existing Gas and National Grid connections.