Skip to content
DecidedSolar farm· EN010135

Stonestreet Green Solar

A nationally significant infrastructure project in Kent, Shepway, Ashford. A decision has been made.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 193 hectares inside the published boundary.

What is proposed

Solar photovoltaic array plus energy storage with associated infrastructure and grid connection, with a generating capacity greater than 50MW.