Pre-applicationHydrogen· EN0110007

Stanlow Hydrogen Ready Modular Combined Heat and Power Project

A nationally significant infrastructure project in Chester, Cheshire West and Chester. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 67 hectares inside the published boundary.

What is proposed

Phase 2: The construction of a hydrogen fuelled combined heat and power project comprising of a combination of Gas Turbines - Heat recovery steam generators and retirement of the EOUK steam turbines with new turbines of suitable capacity. The expected power generation will be 200MW.