Pre-applicationSolar farm· EN0110027

South Brooks Solar Farm

A nationally significant infrastructure project in East Sussex, Kent, Rother, Shepway. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,581 hectares inside the published boundary.

What is proposed

A solar electricity generating station of over 100MW and comprised of ground mounted solar photovoltaic (PV) modules and a Battery Energy Storage System (BESS). The proposed development also includes supporting equipment such as inverters, transformers and switchgears, onsite substations, underground connection cabling to the National Grid, landscape and biodiversity enhancement measures, drainage and storage containers.