Skip to content
Pre-applicationOnshore wind· EN0110042

Redmere Wind Farm

A nationally significant infrastructure project in Cambridgeshire, East Cambridgeshire, Great Yarmouth, Kings Lynn, King's Lynn and West Norfolk, Norfolk, Suffolk, West Suffolk. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 2,379 hectares inside the published boundary.

What is proposed

An onshore wind farm comprising of up to 32 wind turbines (with a height of 220m to blade tip), electrical infrastructure including an on-site substation, transformers, switchgear, buried cabling and a Battery Energy Storage System (BESS), together with site access and highway works, temporary construction infrastructure, and landscaping, habitat management and biodiversity enhancement. The proposed development is anticipated to have an installed generating capacity of approximately 303MW. The grid connection will not form part of the DCO application.

Linked planning applications

Council consultations, related applications and requirement sign-offs that quote this project.

  • 26/70010/SCOP · Huntingdonshire · 1 October 2026

    This application is not being determined by Huntingdonshire District Council. Planning Inspectorate Reference EN0110042. Planning Act 2008 (as amended) and The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (The EIA Regulations) - Regulations 10 and 11 Proposed applicatio

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.