Ossian Transmission Infrastructure
A nationally significant infrastructure project offshore. The application was withdrawn.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
What is proposed
Ossian Offshore Wind Farm Ltd (“the Applicant) is intending to develop transmission infrastructure to connect the Ossian Offshore Wind Farm Array (located in Scottish waters and subject to application for consent under section 36 of the Electricity Act 1989) to National Grid at substations in Lincolnshire. The Proposed Development comprises the installation of high voltage direct current offshore export cables (to the extent that these are located in English waters), landfall structures, HVDC onshore export cables and onshore converter stations, and all other development integral to the construction, operation and maintenance of the Proposed Development, including access. It is proposed that the lifetime of the Proposed Development will be 35 years, at which point the Proposed Development will be decommissioned.
Linked planning applications
Council consultations, related applications and requirement sign-offs that quote this project.
- WL/2025/00205 · West Lindsey · 25 February 2025
PINS consultation on behalf of the Secretary of State for its opinion (a scoping opinion) as to the information to be provided in an Environmental Statement - EN0210006
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.