Decision madeOnshore wind· EN010020

Mynydd y Gwynt Wind Farm

A nationally significant infrastructure project in Powys. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 583 hectares inside the published boundary.

What is proposed

Construction of windfarm east of Aberystwyth within Powys Council local authority boundary. Up to 27 turbines with up to 81-89.1 MW generating capacity. Additional works: substation and control building, monitoring mast, electrical cables, new access tracks and widening existing tracks.