Mynydd y Gwynt Wind Farm
A nationally significant infrastructure project in Powys. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 583 hectares inside the published boundary.
What is proposed
Construction of windfarm east of Aberystwyth within Powys Council local authority boundary. Up to 27 turbines with up to 81-89.1 MW generating capacity. Additional works: substation and control building, monitoring mast, electrical cables, new access tracks and widening existing tracks.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.