WithdrawnElectricity lines· EN020010
Mid Wales Electricity Connection (N Grid)
A nationally significant infrastructure project in Powys. The application was withdrawn.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 753 hectares inside the published boundary.
What is proposed
Construction of a new 400 kV electricity connection between Shropshire and Powys