WithdrawnSolar farm· EN010156

Maen Hir Solar and Energy Storage Project

A nationally significant infrastructure project in Anglesey. The application was withdrawn.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 4,137 hectares inside the published boundary.

What is proposed

Electricity Generating Station including solar photovoltaic panels with a generating capacity in excess of 350MW, a Battery Energy Storage System (BESS), a new substation, and other Associated Development.