Skip to content
Decision madeHighways· TR010030

M25 junction 10/A3 Wisley interchange improvement

A nationally significant infrastructure project in Elmbridge, Guildford, Woking. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 256 hectares inside the published boundary.

What is proposed

In December 2014 the Department for Transport (DfT) published the Road Investment Strategy (RIS) for 2015-2020. The RIS sets out the list of schemes that are to be delivered by Highways England over the period covered by the RIS (2015 – 2020). The RIS identifies improvements to M25 J10/A3 Wisley Interchange as one of the key investments in the SRN for the London and South East region. The proposed improvements being as follows: “improvement of the Wisley interchange to allow free-flowing movement in all directions, together with improvements to the neighbouring Painshill interchange on the A3 to improve safety and congestion across the two sites.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.