Lighthouse Green Fuels Project (WITHDRAWN)
A nationally significant infrastructure project in Stockton-on-Tees. The application was withdrawn.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 206 hectares inside the published boundary.
What is proposed
A ‘waste-to-sustainable aviation fuel’ facility with on-site generating station capacity of up to 150 MW. The facility will treat a combination of commercial & industrial waste, refuse derived fuel (domestic waste) and solid recovered fuel and convert it to various energy-related products, including sustainable aviation fuel and naphtha.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.