Decision madeGas power station· EN010050
Knottingley Power Project
A nationally significant infrastructure project in Doncaster, Harrogate, North Yorkshire, Rotherham, Selby, Wakefield. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 7,568 hectares inside the published boundary.
What is proposed
A 1500 MW Combined Cycle Gas Turbine (CCGT) power station and associated infrastructure.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.