Humberhead Solar
A nationally significant infrastructure project in East Riding. The promoter is consulting and preparing its application.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 3,390 hectares inside the published boundary.
What is proposed
A ground mounted solar photovoltaic (PV) electricity generating station with a renewable electricity capacity of over 100MW. The proposed development includes a Battery Energy Storage System (BESS), landscaping, biodiversity enhancements, grid connection infrastructure and other works and equipment necessary for the construction, operation (including maintenance), and decommissioning phases. The proposed development plans to connect to the existing National Grid Thornton Substation.