East Yorkshire Solar Farm
A nationally significant infrastructure project in East Riding, Harrogate, North Yorkshire, Selby. A decision has been made.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,278 hectares inside the published boundary.
What is proposed
The Scheme will comprise the construction, operation (including maintenance) and decommissioning of ground mounted solar photovoltaic (PV) panel arrays which will generate electrical energy from the sun. The Scheme includes underground cabling to connect to the national electricity transmission network at National Grid's Drax Substation; underground cabling between the areas of solar PV panels; areas of landscaping and biodiversity enhancement; and other associated development.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.