Skip to content
Pre-applicationSolar farm· EN0110010

High Grove Solar

A nationally significant infrastructure project in Norfolk, Breckland. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 3,337 hectares inside the published boundary.

What is proposed

The Scheme comprises the installation of solar photovoltaic (PV) generating panels, on-site energy storage facilities, grid connection infrastructure and ancillary works. The Scheme would have a generating capacity of approximately 720MW.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.