WithdrawnCarbon capture· EN070009

H2Teesside

A nationally significant infrastructure project in Stockton-on-Tees, Hartlepool, Redcar and Cleveland. The application was withdrawn.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 508 hectares inside the published boundary.

What is proposed

A hydrogen production plant of up to 1,200 megawatt thermal capacity; hydrogen distribution pipelines; an air separation unit or oxygen supply pipeline; carbon dioxide capture and compression facilities and a connection to the Northern Endurance Partnership infrastructure (also known as Net Zero Teesside);a natural gas supply connection; other gas pipelines; an electricity grid connection; water supply and treatment infrastructure; wastewater treatment and disposal infrastructure; and other utilities connections, telecommunications and other associated and ancillary infrastructure.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.