Pre-applicationElectricity lines· EN020035
Green Gen Vyrnwy Frankton
A nationally significant infrastructure project in Shropshire, Powys. The promoter is consulting and preparing its application.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 8,938 hectares inside the published boundary.
What is proposed
An overhead line from a collector substation in Powys through the Vyrnwy Valley to a connection point on the national electricity network near Lower Frankton in Shropshire.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.