Decision madeOffshore wind· EN010003

Galloper Offshore Wind Farm

A nationally significant infrastructure project in Suffolk, East Suffolk. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 22,339 hectares inside the published boundary.

What is proposed

The development proposal comprises the installation, operation of Galloper Wind Farm, a proposed offshore generating station and its associated electrical connection. The Galloper Wind Farm generating station would involve the development of up to 140 wind turbine generators, with a maximum capacity of 504MW encompassing an area of 183km2 within three areas. Export cables would be brought to shore and a proposed substation would be constructed to connect the project to the national grid network via existing adjacent transmission towers. Includes new electric downlines and sealing end compounds to connect the wind farm to the existing 400kV network. A full description of the works comprised in the proposed development can be found in Chapter 5 of the Environmental Statement.