The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 28,472 hectares inside the published boundary.

What is proposed

Five Estuaries is an offshore wind farm to generate in excess of 300MW. The project will be comprised of (but not limited to): • an offshore wind farm, including wind turbine generators and associated foundations and array cables; • transmission infrastructure, including offshore substations and associated foundations, offshore and onshore export cables (underground), including associated transition bays and jointing bays, an onshore substation, and connection infrastructure into the National Grid.