Skip to content
Decision madeOther energy· EN010061

Ferrybridge Multifuel 2 (FM2) Power Station

A nationally significant infrastructure project in Wakefield. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 43 hectares inside the published boundary.

What is proposed

Proposed multifuel generating station with a capacity of up to 90 MWe Gross, capable of producing low carbon electricity and heat primarily through waste derived fuel from various sources of processed municipal solid waste, commercial and industrial waste and waste wood. The site is located at Former Golf Course within the site of Ferrybridge ?C? Power Station, Stranglands Lane, Knottingley, West Yorkshire

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.