Decision madeOffshore wind· EN010077

East Anglia ONE North Offshore Windfarm

A nationally significant infrastructure project in Suffolk, East Suffolk. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 34,470 hectares inside the published boundary.

What is proposed

An offshore wind farm which could consist of up to 67 turbines, generators and associated infrastructure, with an installed capacity of up to 800MW, located 36km from Lowestoft and 42km from Southwold. From landfall the cables will be routed underground to an onshore substation, which will in turn connect into the national electricity grid via a National Grid substation and cable sealing end compounds, the latter to be owned and operated by National Grid.