Dogger Bank Creyke Beck
A nationally significant infrastructure project in East Riding. A decision has been made. We are confirming the outcome.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decision made
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 162 hectares inside the published boundary.
What is proposed
Dogger Bank Creyke Beck (previously known as Dogger Bank Offshore Wind Farm) is the first stage of Forewind's offshore wind energy development of the Dogger Bank Zone (Zone 3, Round 3). It will comprise two wind farms, each with an installed capacity of up to 1.2GW, which are expected to connect to the national grid in the East Riding of Yorkshire. Therefore, Dogger Bank Creyke Beck could have a total installed capacity of up to 2.4GW. The offshore wind farms will be located in the Dogger Bank Zone which is located between 125 to 290km off the coast of East Yorkshire. The onshore elements of the development will be located in the East Riding of Yorkshire.