Connah’s Quay Low Carbon Power Project
A nationally significant infrastructure project in Flintshire. The Secretary of State is deciding.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 105 hectares inside the published boundary.
What is proposed
A low-carbon combined cycle gas turbine electricity generating station of up to 1,380 megawatts net electrical output with post-combustion carbon capture; natural gas, cooling water and electricity connections; carbon dioxide connection to the HyNet CO2 Pipeline Project; above ground installations; utilities; construction laydown areas; access; and other associated and ancillary development.