Skip to content
Pre-applicationElectricity lines· EN0210001

Chesterfield to Willington

A nationally significant infrastructure project in Amber Valley, Bolsover, Derby, Derbyshire, Erewash, North East Derbyshire, South Derbyshire. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 9,511 hectares inside the published boundary.

What is proposed

A new 400kV Overhead Line route and associated infrastructure, approximately 60km in length between a proposed new substation in Chesterfield and an existing substation in Willington.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.