Skip to content
Pre-applicationSolar farm· EN0110037

Castle Way Energy

A nationally significant infrastructure project in Derbyshire, Derbyshire Dales, East Staffordshire, South Derbyshire, Staffordshire. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,705 hectares inside the published boundary.

What is proposed

A solar photovoltaic (PV) electricity generating station of over 100MW and associated development comprising Battery Energy Storage System (BESS), substations, grid connection infrastructure and other infrastructure integral to the construction, operation and maintenance, and decommissioning phases. The proposed development plans to connect to the National Grid at the existing Willington 400kV substation.

Linked planning applications

Council consultations, related applications and requirement sign-offs that quote this project.

  • P/2026/00708 · East Staffordshire · 17 June 2026

    Consultation - Planning Inspectorate Reference: EN0110037 - Castle Way Energy - EIA Scoping Report - BSSL Derbyshire 1 LTD - proposed solar development with co-located battery energy storage systems (‘BESS’) and associated cable corridors (‘the Proposed Development’). This report forms a formal requ

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.