Decision madeOffshore wind· EN010112

Awel y Môr Offshore Wind Farm

A nationally significant infrastructure project in Denbighshire. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 12,460 hectares inside the published boundary.

What is proposed

Awel y Môr is an offshore wind farm, to generate in excess of 500MW. The project will be comprised of (but not limited to): an offshore wind farm, including wind turbine generators and associated foundations, wind measurement equipment and array cables; transmission infrastructure, including offshore substations and associated foundations, offshore and onshore export cables (underground), including associated transition bays and jointing bays, an onshore substation, and connection infrastructure into the National Grid.