Skip to content
Decision madeHighways· TR010016

A63 Castle Street Improvement-Hull

A nationally significant infrastructure project in East Riding, Hull. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 34 hectares inside the published boundary.

What is proposed

The Scheme comprises the following improvements to approximately 1.5km of the A63 and connecting side roads in Hull between Ropery Street and the Market Place/Queen Street junction: - Lowering the level of the A63 by approximately 7m into an underpass at the Mytongate Junction and raising Ferensway and Commercial Road by approximately 1m creating a grade separated (split-level) junction. New east and west-bound slip roads would link the A63 and Mytongate Junction. - Widening the east-bound carriageway of the A63 to three lands between Princes Dock Street and Market Place, with the nearside lane being marked for local traffic. - Removing all existing signal controlled and uncontrolled pedestrian crossings on the A63, between Ropery Street and the Market Place/Queen Street junction. - Providing a new bridge over the A63 for pedestrians, cycles and disabled users at Porter Street. - Providing a new bridge over the A63 for pedestrians, cycles and disabled users south of Princes Quay shopping centre.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.