Two-storey and first-floor extensions in Barnet
Barnet approved 745 of the 1,078 planning applications for two-storey and first-floor extensions it decided in the last five years (69%), and the typical decision took 56 days.
London Borough of Barnet · planning applications received Nov 2021 to Nov 2026 · updated 28 Nov 2026
Approved
745 of 1,078
69% of decided applications; 86 withdrawn, 114 undecided
Typical time to a decision
56 days
median, from 1,078 decisions with both dates published
Decided within 8 weeks
619 of 1,078
8 weeks is the usual statutory period; councils can agree extensions
See what was approved near your own address
The Signal Report shows approvals and refusals for two-storey and first-floor extensions within 250 m, 500 m and 1 km of your home, the council's reasons for refusing similar schemes, your property's planning history and the constraints on the plot. Free preview for any address.
Recent decisions
Part single, part two storey side and rear extensions following demolition of the existing bunker
26/3585/HSE · decided 24 Nov 2026
Part single, part two storey rear extension with pitched roof and 3no. rooflights and flat roof on first floor rear element. First floor fr…
26/3533/HSE · decided 24 Nov 2026
- Approved10 Vaughan Avenue London NW4 4HU
Single storey rear extension. Conversion of existing garage into habitable room including single storey front extension. First floor side e…
26/3538/HSE · decided 23 Nov 2026
First floor rear extension. Alterations to the single storey rear extension to include side door
26/3500/HSE · decided 23 Nov 2026
Part single, part two storey rear extension with flat roof and 1no. skylight
26/3382/HSE · decided 20 Nov 2026
Why Barnet refuses two-storey and first-floor extensions
The council's own words, quoted from recent decision notices.
45 Arlington Road London N14 5BB
“1 The proposed development, by reason of the excessive depth, scale and massing of the single storey rear extension, together with the siting of the first floor side extension and its failure to provide a suitable setback from the shared side boundary, would result in a dominant, bulky and visually intrusive form of development. The extensions would fail to appear subordinate to the host dwelling and would appear incongruous within the established pattern of development along Arlington Road. The proposal would therefore cause harm to the character and appearance of the host dwelling, the stre…”
109 And 111 Greenfield Gardens London NW2 1HU
“1 The ground floor front extension, by reason of its scale, massing, design and siting, and the first floor rear extension, by reason of its scale, bulk, massing, design and siting, would represent disproportionate and unsympathetic additions, incongruous to the established pattern of development, to the detriment of the character and appearance of the host property and surrounding area, contrary to Policy D3 of the London Plan (2021), Policies CDH01 and CDH05 of the LB Barnet Local Plan (2025) and the Sustainable Design and Development Guidance SPD (2026)”
Health Centre 2 Penshurst Gardens Edgware HA8 9GJ
“1 The proposed mansard roof extension, by reason of its scale, bulk, height and form, together with the excessive number, size and prominence of the proposed dormer extensions, would result in a disproportionate and overly dominant addition to the existing building. The cumulative impact of the mansard roof and dormers would create a top-heavy and unbalanced appearance that would fail to integrate satisfactorily with the host property, eroding its original character and proportions. Furthermore, the development would appear visually intrusive and incongruous within the surrounding street scen…”
Other home extensions in Barnet
- Loft conversions
648 of 931 approved (70%)
- Single-storey rear extensions
1,052 of 1,309 approved (80%)
- Single-storey side extensions
220 of 252 approved (87%)
How these figures are made
Planning applications London Borough of Barnet received Nov 2021 to Nov 2026, from the council's public planning register as collected by Planning Signal. An application counts as a two-storey extension when its own description says so (rules-based classification, tested against blind labelled samples). Duplicate records of one application are counted once. The approval figure counts approved and refused planning applications only: withdrawn and undecided ones, lawful development certificates and prior approvals are left out. Decision times use the received (or validated) date and the decision date the council published.
Past decisions describe what happened to other applications. They are not a prediction for yours: every application is decided on its own design and the council's current policies.