Loft conversions in Barnet
Barnet approved 648 of the 931 planning applications for loft conversions it decided in the last five years (70%), and the typical decision took 56 days.
London Borough of Barnet · planning applications received Nov 2021 to Nov 2026 · updated 27 Nov 2026
Approved
648 of 931
70% of decided applications; 65 withdrawn, 99 undecided
Typical time to a decision
56 days
median, from 931 decisions with both dates published
Decided within 8 weeks
539 of 931
8 weeks is the usual statutory period; councils can agree extensions
See what was approved near your own address
The Signal Report shows approvals and refusals for loft conversions within 250 m, 500 m and 1 km of your home, the council's reasons for refusing similar schemes, your property's planning history and the constraints on the plot. Free preview for any address.
Recent decisions
Excavation of basement level with associated front and western lightwells. Single storey rear extensions with new patio area. Alterations t…
26/3385/HSE · decided 25 Nov 2026
- Approved22 Greenhalgh Walk London N2 0DJ
Roof extension involving rear dormer window and 1no. side conservation rooflight
26/3298/HSE · decided 24 Nov 2026
Roof extension including 1no. rear dormer window and 2no. front facing and 2no. side facing rooflights
26/3626/FUL · decided 24 Nov 2026
Single storey rear, part two storey side extension with 1no. rooflight following the demolition of existing shed. Roof extension with rear…
26/3396/HSE · decided 12 Nov 2026
- Refused3 Southway London N20 8EB
Conversion of the existing garage into habitable room, insertion of window to replace the garage door. Roof extension hip to gable, rear do…
26/3499/HSE · decided 9 Nov 2026
Why Barnet refuses loft conversions
The council's own words, quoted from recent decision notices.
“1 The proposed roof extension, by reason of its excessive scale, bulk, siting and design, would constitute a disproportionate and incongruous addition that fails to respect the architectural character of the host property. The development would therefore be detrimental to the character and appearance of the host property and surrounding locality, contrary to Policy CDH01 and Policy CDH05 of the Barnet Local Plan (March 2025), Policy D3 of the London Plan (2021), and the Council's Sustainable Design and Development Guidance SPD (2026).”
Health Centre 2 Penshurst Gardens Edgware HA8 9GJ
“1 The proposed mansard roof extension, by reason of its scale, bulk, height and form, together with the excessive number, size and prominence of the proposed dormer extensions, would result in a disproportionate and overly dominant addition to the existing building. The cumulative impact of the mansard roof and dormers would create a top-heavy and unbalanced appearance that would fail to integrate satisfactorily with the host property, eroding its original character and proportions. Furthermore, the development would appear visually intrusive and incongruous within the surrounding street scen…”
114 Leicester Road Barnet EN5 5DN
“1 The proposed roof extension, would, by reason of its size, siting, bulk, massing and unsatisfactory design would result in a disproportionate and incongruous addition which would fail to respond sensitively to the existing dwelling house and unbalance the pair of semi detached dwellings, creating a harmful degree of visual clutter at roof level to the detriment of the character and appearance of the host property, the street scene and the surrounding area, contrary to Policy D3 of the London Plan (2021), Policies CDH01 and CDH05 of the LB Barnet Local Plan (2025) and the Sustainable Design…”
Other home extensions in Barnet
- Single-storey rear extensions
1,052 of 1,309 approved (80%)
- Single-storey side extensions
220 of 252 approved (87%)
- Two-storey and first-floor extensions
745 of 1,078 approved (69%)
How these figures are made
Planning applications London Borough of Barnet received Nov 2021 to Nov 2026, from the council's public planning register as collected by Planning Signal. An application counts as a loft conversion when its own description says so (rules-based classification, tested against blind labelled samples). Duplicate records of one application are counted once. The approval figure counts approved and refused planning applications only: withdrawn and undecided ones, lawful development certificates and prior approvals are left out. Decision times use the received (or validated) date and the decision date the council published.
Past decisions describe what happened to other applications. They are not a prediction for yours: every application is decided on its own design and the council's current policies.